Briefing on BRP Artemis BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
411 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Artemis BESS is a 411 MW Battery project in Texas, currently active.

BRP Artemis BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.

Queue ID
ERCOT-24INR0130
Location
Grimes, Texas
Technology
Battery
Developer
BRP Artemis BESS LLC
Market / region
ERCOT
Point of interconnection
40600 Roans Prairie Substation 345kV

What stands out

1

BRP Artemis BESS is a 411 MW Battery project in Texas with status active.

2

BRP Artemis BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-01.

Market and operating context

Queue date
2021-12-20
Proposed COD
2028-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Artemis BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0130
LocationGrimes, Texas
TechnologyBattery
DeveloperBRP Artemis BESS LLC
Market / regionERCOT
Point of interconnection40600 Roans Prairie Substation 345kV
Queue date2021-12-20
Proposed COD2028-12-01