Query
BRP Ampato BESS
Type
Entity Briefing
Entity
BRP Ampato BESS
State
TN
Technology
battery
Generated
2026-10-19T17:07:06.772Z

Briefing on BRP Ampato BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
122 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

BRP Ampato BESS is a 122 MW Battery project in Texas, currently active.

BRP Ampato BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-23INR0074
Location
Crane, Texas
Technology
Battery
Developer
BRP Ampato BESS LLC
Market / region
ERCOT
Point of interconnection
10002 NS Crane Switch 138kV

What stands out

1

BRP Ampato BESS is a 122 MW Battery project in Texas with status active.

2

BRP Ampato BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

Market and operating context

Queue date
2020-08-04
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BRP Ampato BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0074
LocationCrane, Texas
TechnologyBattery
DeveloperBRP Ampato BESS LLC
Market / regionERCOT
Point of interconnection10002 NS Crane Switch 138kV
Queue date2020-08-04
Proposed COD2027-12-01