Briefing on Bronc Rodeo Solar Project

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
122 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-09-18
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bronc Rodeo Solar Project is a 122 MW Solar project in Texas, currently active.

Energiekontor US Texas SP 16 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-18.

Queue ID
ERCOT-25INR0440
Location
Falls, Texas
Technology
Solar
Developer
Energiekontor US Texas SP 16 LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)

What stands out

1

Bronc Rodeo Solar Project is a 122 MW Solar project in Texas with status active.

2

Energiekontor US Texas SP 16 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-18.

Market and operating context

Queue date
2023-05-03
Proposed COD
2028-09-18
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bronc Rodeo Solar Project — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0440
LocationFalls, Texas
TechnologySolar
DeveloperEnergiekontor US Texas SP 16 LLC
Market / regionERCOT
Point of interconnectionTap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Switch (#3385)
Queue date2023-05-03
Proposed COD2028-09-18