Query
Brightside Solar Alt POI
Type
Entity Briefing
Entity
Brightside Solar Alt POI
Generated
2026-10-19T22:18:34.487Z

Briefing on Brightside Solar Alt POI

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-08-14
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Brightside Solar Alt POI is a 50 MW Solar project in Texas, currently active.

Brightside Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-08-14.

Queue ID
ERCOT-23INR0487
Location
Live Oak, Texas
Technology
Solar
Developer
Brightside Solar, LLC
Market / region
ERCOT
Point of interconnection
8156 Charter Substation 138kV

What stands out

1

Brightside Solar Alt POI is a 50 MW Solar project in Texas with status active.

2

Brightside Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-08-14.

Market and operating context

Queue date
2022-05-16
Proposed COD
2026-08-14
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Brightside Solar Alt POI — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0487
LocationLive Oak, Texas
TechnologySolar
DeveloperBrightside Solar, LLC
Market / regionERCOT
Point of interconnection8156 Charter Substation 138kV
Queue date2022-05-16
Proposed COD2026-08-14