Query
Briggs Solar
Type
Entity Briefing
Entity
Briggs Solar
Generated
2026-10-19T07:32:42.252Z

Briefing on Briggs Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
324 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-04-15
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Briggs Solar is a 324 MW Solar+Battery project in Texas, currently active.

IP Quantum III, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-04-15.

Queue ID
ERCOT-23INR0059
Location
Haskell, Texas
Technology
Solar+Battery
Developer
IP Quantum III, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 60515 Clear Crossing - 60507 Pendulo

What stands out

1

Briggs Solar is a 324 MW Solar+Battery project in Texas with status active.

2

IP Quantum III, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-04-15.

4

Latest linked story: “Lamar County celebrates commencement of half-billion dollar solar project” (KXII, 2024-11-21).

Market and operating context

Queue date
2020-08-04
Proposed COD
2028-04-15
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Briggs Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0059
LocationHaskell, Texas
TechnologySolar+Battery
DeveloperIP Quantum III, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 60515 Clear Crossing - 60507 Pendulo
Queue date2020-08-04
Proposed COD2028-04-15