Briefing/projectactive
Brazos Energy Center 2 is a 301 MW Battery project in Texas, currently active.
Ferrovial Energy US 1 is the reported developer. Proposed COD is 2029-09-18.
- Queue ID
- ERCOT-29INR0230
- Location
- McLennan, Texas
- Technology
- Battery
- Developer
- Ferrovial Energy US 1
- Market / region
- ERCOT
- Point of interconnection
- Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>
What stands out
1
Brazos Energy Center 2 is a 301 MW Battery project in Texas with status active.
2
Ferrovial Energy US 1 is the reported developer.
3
proposed COD is 2029-09-18.
Market and operating context
- Queue date
- 2026-01-13
- Proposed COD
- 2029-09-18
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.