Brazos Bend Solar SLF is a 243 MW Solar+Battery project in Texas, currently active.
Grenergy USA is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-09-17.
- Queue ID
- ERCOT-29INR0163
- Location
- Milam, Texas
- Technology
- Solar+Battery
- Developer
- Grenergy USA
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Line (3765) GRISTMILL_5 to (39950) TNTNP_ONE_3
What stands out
1
Brazos Bend Solar SLF is a 243 MW Solar+Battery project in Texas with status active.
2
Grenergy USA is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-09-17.
Market and operating context
- Queue date
- 2025-09-11
- Proposed COD
- 2029-09-17
- IA status
- Facility Study
- Study phase
- Facility Study