Brainerd Public Utilities is a 3 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Out of service.
Brainerd Public Utilities is reported in Minnesota since 1917 under Brainerd Public Utilities. Available operating and financial measures include 43.0% capacity factor and 11 GWh annual generation; $2294/kW reported CapEx.
- Location
- Crow Wing, Minnesota
- Technology
- Conventional Hydroelectric
- Owner / parent
- Brainerd Public Utilities
- Operator
- Brainerd Public Utilities
- Grid
- MISO (Midcontinent)
- Plant ID
- 50636
What stands out
Brainerd Public Utilities is a 3 MW Conventional Hydroelectric asset in Minnesota with status Out of service.
Latest annual operating measures report 43.0% capacity factor and 11 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #15 of 23
- National rank
- #1093 of 1,462
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.