Query
Brady Wind Energy Center
Type
Entity Briefing
Entity
Brady Wind Energy Center
Technology
wind
Generated
2026-10-19T12:28:03.236Z

Briefing on Brady Wind Energy Center

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
150 MW
Capacity
Operating
Current status
2016
Operating since
1
Generators
48.1%
Capacity factor
632 GWh
Annual generation
Briefing/plantOperating

Brady Wind Energy Center is a 150 MW Onshore Wind Turbine asset in SPP (Southwest Power Pool), currently Operating.

Brady Wind Energy Center is reported in North Dakota since 2016 under NextEra Energy. Available operating and financial measures include 48.1% capacity factor and 632 GWh annual generation.

Location
Stark, North Dakota
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
Brady Wind, LLC
Grid
SPP (Southwest Power Pool)
Plant ID
60355

What stands out

1

Brady Wind Energy Center is a 150 MW Onshore Wind Turbine asset in North Dakota with status Operating.

2

Latest annual operating measures report 48.1% capacity factor and 632 GWh annual generation.

3

Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#14 of 45
National rank
#509 of 1,442

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.