Briefing/plantPlanned
Boulder Solar III LLC is a 256 MW Batteries asset in Nevada, currently Planned.
Boulder Solar III LLC is reported in Nevada under 174 Power Global Corp.. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Clark, Nevada
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- 174 Power Global Corp.
- Operator
- 174 Power Global Corp.
- Grid
- Nevada Power Company
- Plant ID
- 65141
What stands out
1
Boulder Solar III LLC is a 256 MW Batteries asset in Nevada with status Planned.
2
Available financial measures include $1544/kW CapEx.
3
Latest linked story: “170MW data center campus proposed in Boulder, Nevada” (Data Center Dynamics, 2026-03-29).
Market and operating context
- Balancing authority
- Nevada Power Company
- NERC region
- WECC
- State rank
- #9 of 14
- National rank
- #113 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.