Border Basin Solar is a 120 MW Solar Photovoltaic asset in PJM Interconnection, currently Under construction.
Border Basin Solar is reported in Ohio under Border Basin, LLC. Available operating and financial measures include $1606/kW reported CapEx.
- Location
- Hancock, Ohio
- Technology
- Solar Photovoltaic
- Owner / parent
- Border Basin, LLC
- Operator
- Border Basin, LLC
- Grid
- PJM Interconnection
- Plant ID
- 68968
What stands out
Border Basin Solar is a 120 MW Solar Photovoltaic asset in Ohio with status Under construction.
Available financial measures include $1606/kW CapEx.
1 linked queue projects represent 120 MW of proposed capacity.
Latest linked story: “Decision on proposed Arcadia solar farm could fall to county commissioners” (WTOL, 2021-07-29).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #26 of 92
- National rank
- #713 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.