Query
Borden Dino BESS
Type
Entity Briefing
Entity
Borden Dino BESS
State
IL
Technology
battery
Generated
2026-10-19T15:15:19.934Z

Briefing on Borden Dino BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
60 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Borden Dino BESS is a 60 MW Solar+Battery project in Texas, currently active.

Borden Dino Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-27INR0481
Location
Borden, Texas
Technology
Solar+Battery
Developer
Borden Dino Solar, LLC
Market / region
ERCOT
Point of interconnection
59905 FARADAY 345KV

What stands out

1

Borden Dino BESS is a 60 MW Solar+Battery project in Texas with status active.

2

Borden Dino Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2025-04-01
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Borden Dino BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0481
LocationBorden, Texas
TechnologySolar+Battery
DeveloperBorden Dino Solar, LLC
Market / regionERCOT
Point of interconnection59905 FARADAY 345KV
Queue date2025-04-01
Proposed COD2028-07-01