Briefing on Boling Generation (TEF-Due Diligience)

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
400 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2028-12-16
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Boling Generation (TEF-Due Diligience) is a 400 MW Gas project in Texas, currently active.

Boling Generation is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-16.

Queue ID
ERCOT-24INR0576
Location
Wharton, Texas
Technology
Gas
Developer
Boling Generation
Market / region
ERCOT
Point of interconnection
43340 Gulftie 138kV

What stands out

1

Boling Generation (TEF-Due Diligience) is a 400 MW Gas project in Texas with status active.

2

Boling Generation is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-16.

Market and operating context

Queue date
2023-12-04
Proposed COD
2028-12-16
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Boling Generation (TEF-Due Diligience) — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0576
LocationWharton, Texas
TechnologyGas
DeveloperBoling Generation
Market / regionERCOT
Point of interconnection43340 Gulftie 138kV
Queue date2023-12-04
Proposed COD2028-12-16