Bob Creek Wind is a 240 MW Wind project in Texas, currently active.
NextEra Energy Interconnection Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-27INR0076
- Location
- Sterling, Texas
- Technology
- Wind
- Developer
- NextEra Energy Interconnection Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- 59902 Sand Bluff 345kV
What stands out
Bob Creek Wind is a 240 MW Wind project in Texas with status active.
NextEra Energy Interconnection Holdings, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2028-07-01.
Latest linked story: “Wind turbine blade recycling picks up speed” (C&EN, 2024-10-03).
Market and operating context
- Queue date
- 2024-01-11
- Proposed COD
- 2028-07-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.