Query
BM Freestone Energy Center
Type
Entity Briefing
Entity
BM Freestone Energy Center
Generated
2026-10-18T04:47:20.647Z

Briefing on BM Freestone Energy Center

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
991 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2029-09-20
Proposed COD
Briefing/projectactive

BM Freestone Energy Center is a 991 MW Gas project in Texas, currently active.

Black Mountain Energy Storage II is the reported developer. Proposed COD is 2029-09-20.

Queue ID
ERCOT-29INR0298
Location
Freestone, Texas
Technology
Gas
Developer
Black Mountain Energy Storage II
Market / region
ERCOT
Point of interconnection
Loop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at 31.813367° -96.147730°

What stands out

1

BM Freestone Energy Center is a 991 MW Gas project in Texas with status active.

2

Black Mountain Energy Storage II is the reported developer.

3

proposed COD is 2029-09-20.

Market and operating context

Queue date
2026-02-25
Proposed COD
2029-09-20

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BM Freestone Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0298
LocationFreestone, Texas
TechnologyGas
DeveloperBlack Mountain Energy Storage II
Market / regionERCOT
Point of interconnectionLoop Big Brown E to Navarro Ckt 1(PTI#3380-68091) and Big Brown W to Tarantulla Ckt 1 (PTI#3381-3344) at 31.813367° -96.147730°
Queue date2026-02-25
Proposed COD2029-09-20