Query
Blythe Solar IV, LLC
Type
Entity Briefing
Entity
Blythe Solar IV, LLC
Generated
2026-10-09T16:04:48.103Z

Briefing on Blythe Solar IV, LLC

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
184 MW
Capacity
Operating
Current status
2020
Operating since
3
Generators
21.5%
Capacity factor
347 GWh
Annual generation
Briefing/plantOperating

Blythe Solar IV, LLC is a 184 MW Batteries asset in CAISO (California), currently Operating.

Blythe Solar IV, LLC is reported in California since 2020 under NextEra Energy. Available operating and financial measures include 21.5% capacity factor and 347 GWh annual generation.

Location
Riverside, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Blythe Solar IV, LLC
Grid
CAISO (California)
Plant ID
60095

What stands out

1

Blythe Solar IV, LLC is a 184 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 21.5% capacity factor and 347 GWh annual generation.

3

Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#69 of 992
National rank
#455 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.