Query
Blythe Mesa Solar II
Type
Entity Briefing
Entity
Blythe Mesa Solar II
Generated
2026-10-18T01:06:57.300Z

Briefing on Blythe Mesa Solar II

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
336 MW
Capacity
Operating
Current status
2022
Operating since
2
Generators
19.9%
Capacity factor
585 GWh
Annual generation
Briefing/plantOperating

Blythe Mesa Solar II is a 336 MW Batteries asset in CAISO (California), currently Operating.

Blythe Mesa Solar II is reported in California since 2022 under Intersect USA, LLC. Available operating and financial measures include 19.9% capacity factor and 585 GWh annual generation.

Location
Riverside, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Intersect USA, LLC
Operator
Intersect USA, LLC
Grid
CAISO (California)
Plant ID
65053

What stands out

1

Blythe Mesa Solar II is a 336 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 19.9% capacity factor and 585 GWh annual generation.

3

Latest linked story: “Tesla lands 15.3 GWh Megapack supply contract” (pv magazine USA, 2024-07-19).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#25 of 992
National rank
#114 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.