Blythe Mesa Solar II is a 336 MW Batteries asset in CAISO (California), currently Operating.
Blythe Mesa Solar II is reported in California since 2022 under Intersect USA, LLC. Available operating and financial measures include 19.9% capacity factor and 585 GWh annual generation.
- Location
- Riverside, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Intersect USA, LLC
- Operator
- Intersect USA, LLC
- Grid
- CAISO (California)
- Plant ID
- 65053
What stands out
Blythe Mesa Solar II is a 336 MW Batteries asset in California with status Operating.
Latest annual operating measures report 19.9% capacity factor and 585 GWh annual generation.
Latest linked story: “Tesla lands 15.3 GWh Megapack supply contract” (pv magazine USA, 2024-07-19).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #25 of 992
- National rank
- #114 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.