247 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-07-02
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bluewind BESS is a 247 MW Battery project in Texas, currently active.

Bluewind Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-02.

Queue ID
ERCOT-27INR0396
Location
Atascosa, Texas
Technology
Battery
Developer
Bluewind Energy Center, LLC
Market / region
ERCOT
Point of interconnection
5713 Oaks Substation 138kV

What stands out

1

Bluewind BESS is a 247 MW Battery project in Texas with status active.

2

Bluewind Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-02.

Market and operating context

Queue date
2025-04-25
Proposed COD
2029-07-02
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bluewind BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0396
LocationAtascosa, Texas
TechnologyBattery
DeveloperBluewind Energy Center, LLC
Market / regionERCOT
Point of interconnection5713 Oaks Substation 138kV
Queue date2025-04-25
Proposed COD2029-07-02