Query
Blue Summit III Wind
Type
Entity Briefing
Entity
Blue Summit III Wind
Technology
wind
Generated
2026-09-30T05:26:01.644Z

Briefing on Blue Summit III Wind

Entity Briefing
Generated Sep 30, 2026·Dataset freshness not reported
200 MW
Capacity
Operating
Current status
2019
Operating since
1
Generators
42.7%
Capacity factor
748 GWh
Annual generation
Briefing/plantOperating

Blue Summit III Wind is a 200 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Blue Summit III Wind is reported in Texas since 2019 under NextEra Energy. Available operating and financial measures include 42.7% capacity factor and 748 GWh annual generation; $1166/kW reported CapEx.

Location
Hardeman, Texas
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
Blue Summit III Wind, LLC
Grid
ERCOT (Texas)
Plant ID
62566

What stands out

1

Blue Summit III Wind is a 200 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 42.7% capacity factor and 748 GWh annual generation.

3

Available financial measures include $1166/kW CapEx.

4

Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#101 of 252
National rank
#312 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.