Briefing/projectactive
Blue Moon Solar is a 70 MW Solar project in Kentucky, currently active.
The reported queue phase is IA Executed. Proposed COD is 2026-12-31.
- Queue ID
- PJM-AD2-048
- Location
- Harrison, Kentucky
- Technology
- Solar
- Market / region
- PJM
- Point of interconnection
- Cynthia-Headquarters 69 kV
What stands out
1
Blue Moon Solar is a 70 MW Solar project in Kentucky with status active.
2
The reported queue phase is IA Executed; proposed COD is 2026-12-31.
3
Latest linked story: “Recurrent Energy Sells Hybrid 275 MW Solar and 120 MW Battery Project” (Mercom Capital Group, 2025-11-20).
Market and operating context
- Queue date
- 2018-02-01
- Proposed COD
- 2026-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.