Blue Lake Hydro is a 16 MW Conventional Hydroelectric asset in Alaska, currently Operating.
Blue Lake Hydro is reported in Alaska since 2014 under City & Borough of Sitka - (AK). Available operating and financial measures include 54.1% capacity factor and 75 GWh annual generation; $1221/kW reported CapEx.
- Location
- Sitka, Alaska
- Technology
- Conventional Hydroelectric
- Owner / parent
- City & Borough of Sitka - (AK)
- Operator
- City & Borough of Sitka - (AK)
- Plant ID
- 93
What stands out
Blue Lake Hydro is a 16 MW Conventional Hydroelectric asset in Alaska with status Operating.
Latest annual operating measures report 54.1% capacity factor and 75 GWh annual generation.
Available financial measures include $1221/kW CapEx.
Latest linked story: “Chugach Electric Association Brings Affordable, Reliable Energy To Alaska” (The Business Download |, 2026-02-28).
Market and operating context
- State rank
- #10 of 31
- National rank
- #536 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.