Briefing/projectsuspended
Blue Hills Wind is a 276 MW Wind project in Texas, currently suspended.
Proposed COD is 2026-06-15.
- Queue ID
- ERCOT-20INR0271
- Location
- Val Verde, Texas
- Technology
- Wind
- Market / region
- ERCOT
What stands out
1
Blue Hills Wind is a 276 MW Wind project in Texas with status suspended.
2
proposed COD is 2026-06-15.
3
Latest linked story: “Exclusive: Inside A Chinese Billionaire’s Bizarre Maneuvers To Save His Texas Land” (Forbes, 2023-05-26).
Market and operating context
- Queue date
- 2019-05-06
- Proposed COD
- 2026-06-15
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.