Briefing/plantOperating
Blairs Valley Solar Project is a 20 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.
Blairs Valley Solar Project is reported in Pennsylvania since 2025 under CleanChoice Energy. Available operating and financial measures include $2584/kW reported CapEx.
- Location
- Franklin, Pennsylvania
- Technology
- Solar Photovoltaic
- Owner / parent
- CleanChoice Energy
- Operator
- CleanChoice Energy
- Grid
- PJM Interconnection
- Plant ID
- 69235
What stands out
1
Blairs Valley Solar Project is a 20 MW Solar Photovoltaic asset in Pennsylvania with status Operating.
2
Available financial measures include $2584/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- State rank
- #34 of 99
- National rank
- #1725 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.