Query
BKV-BPP Ponder Solar
Type
Entity Briefing
Entity
BKV-BPP Ponder Solar
Generated
2026-10-17T06:34:09.791Z

Briefing on BKV-BPP Ponder Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
8.8%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

BKV-BPP Ponder Solar is a 3 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

BKV-BPP Ponder Solar is reported in Texas since 2024 under PPM Solar LLC. Available operating and financial measures include 8.8% capacity factor and 2 GWh annual generation; $1543/kW reported CapEx.

Location
Denton, Texas
Technology
Solar Photovoltaic
Owner / parent
PPM Solar LLC
Operator
PPM Solar LLC
Grid
ERCOT (Texas)
Plant ID
66571

What stands out

1

BKV-BPP Ponder Solar is a 3 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 8.8% capacity factor and 2 GWh annual generation.

3

Available financial measures include $1543/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#356 of 378
National rank
#4979 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.