Query
Bishop Ranch - BR 8-Q
Type
Entity Briefing
Entity
Bishop Ranch - BR 8-Q
Generated
2026-10-08T04:31:19.116Z

Briefing on Bishop Ranch - BR 8-Q

Entity Briefing
Generated Oct 8, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2025
Operating since
2
Generators
Briefing/plantOperating

Bishop Ranch - BR 8-Q is a 1 MW Batteries asset in CAISO (California), currently Operating.

Bishop Ranch - BR 8-Q is reported in California since 2025 under Executive Parkway BR8-Q Solar Project 2020 LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Contra Costa, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Executive Parkway BR8-Q Solar Project 2020 LLC
Operator
Executive Parkway BR8-Q Solar Project 2020 LLC
Grid
CAISO (California)
Plant ID
68523

What stands out

1

Bishop Ranch - BR 8-Q is a 1 MW Batteries asset in California with status Operating.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#849 of 992
National rank
#7025 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Bishop Ranch - BR 8-Q — verified asset snapshot

FieldValue
LocationContra Costa, California
TechnologyBatteries, Solar Photovoltaic
Owner / parentExecutive Parkway BR8-Q Solar Project 2020 LLC
OperatorExecutive Parkway BR8-Q Solar Project 2020 LLC
GridCAISO (California)
Plant ID68523
ISO / marketCAISO (California)
Balancing authorityCalifornia Independent System Operator