Briefing/plantOperating
Bishop Ranch - BR 15-DD is a 1 MW Batteries asset in CAISO (California), currently Operating.
Bishop Ranch - BR 15-DD is reported in California since 2025 under Alcosta Boulevard BR 15-DD Solar Project 2020, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Contra Costa, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Alcosta Boulevard BR 15-DD Solar Project 2020, LLC
- Operator
- Alcosta Boulevard BR 15-DD Solar Project 2020, LLC
- Grid
- CAISO (California)
- Plant ID
- 67277
What stands out
1
Bishop Ranch - BR 15-DD is a 1 MW Batteries asset in California with status Operating.
2
Available financial measures include $1361/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #883 of 992
- National rank
- #7068 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.