Query
Bishop Ranch BR 1-X
Type
Entity Briefing
Entity
Bishop Ranch BR 1-X
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Bishop Ranch BR 1-X

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2022
Operating since
3
Generators
12.6%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Bishop Ranch BR 1-X is a 1 MW Batteries asset in CAISO (California), currently Operating.

Bishop Ranch BR 1-X is reported in California since 2022 under Bollinger Canyon Road BR 1-X Solar Project 2020. Available operating and financial measures include 12.6% capacity factor and 2 GWh annual generation; $1205/kW reported CapEx.

Location
Contra Costa, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Bollinger Canyon Road BR 1-X Solar Project 2020
Operator
Bollinger Canyon Road BR 1-X Solar Project 2020
Grid
CAISO (California)
Plant ID
67743

What stands out

1

Bishop Ranch BR 1-X is a 1 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 12.6% capacity factor and 2 GWh annual generation.

3

Available financial measures include $1205/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#784 of 992
National rank
#6828 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.