Bishop Ranch BR 1-X is a 1 MW Batteries asset in CAISO (California), currently Operating.
Bishop Ranch BR 1-X is reported in California since 2022 under Bollinger Canyon Road BR 1-X Solar Project 2020. Available operating and financial measures include 12.6% capacity factor and 2 GWh annual generation; $1205/kW reported CapEx.
- Location
- Contra Costa, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Bollinger Canyon Road BR 1-X Solar Project 2020
- Operator
- Bollinger Canyon Road BR 1-X Solar Project 2020
- Grid
- CAISO (California)
- Plant ID
- 67743
What stands out
Bishop Ranch BR 1-X is a 1 MW Batteries asset in California with status Operating.
Latest annual operating measures report 12.6% capacity factor and 2 GWh annual generation.
Available financial measures include $1205/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #784 of 992
- National rank
- #6828 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.