Query
Bishop Creek 2
Type
Entity Briefing
Entity
Bishop Creek 2
Generated
2026-10-20T02:40:16.561Z

Briefing on Bishop Creek 2

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
7 MW
Capacity
Operating
Current status
1908
Operating since
3
Generators
25.5%
Capacity factor
16 GWh
Annual generation
Briefing/plantOperating

Bishop Creek 2 is a 7 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Bishop Creek 2 is reported in California since 1908 under Edison International. Available operating and financial measures include 25.5% capacity factor and 16 GWh annual generation; $2689/kW reported CapEx.

Location
Inyo, California
Technology
Conventional Hydroelectric
Owner / parent
Edison International
Operator
Southern California Edison Co
Grid
CAISO (California)
Plant ID
323

What stands out

1

Bishop Creek 2 is a 7 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 25.5% capacity factor and 16 GWh annual generation.

3

Available financial measures include $78.1/MWh OpEx, $2689/kW CapEx.

4

Latest linked story: “Making the Electric Grid More Resilient to Extreme Weather” (Energized by Edison, 2021-11-02).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#141 of 247
National rank
#760 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.