Briefing/projectactive
Biggs Solar is a 400 MW Solar+Battery project in Texas, currently active.
Biggs Solar Farm, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-15.
- Queue ID
- ERCOT-28INR0111
- Location
- Mcculloch, Texas
- Technology
- Solar+Battery
- Developer
- Biggs Solar Farm, LLC
- Market / region
- ERCOT
- Point of interconnection
- #76006 Bow Wood 345 kV
What stands out
1
Biggs Solar is a 400 MW Solar+Battery project in Texas with status active.
2
Biggs Solar Farm, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-11-15.
Market and operating context
- Queue date
- 2024-07-22
- Proposed COD
- 2028-11-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.