Query
Big Turtle Wind Farm 2
Type
Entity Briefing
Entity
Big Turtle Wind Farm 2
Technology
wind
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Big Turtle Wind Farm 2

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

29 MW
Capacity
Operating
Current status
2016
Operating since
1
Generators
41.5%
Capacity factor
107 GWh
Annual generation
Briefing/plantOperating

Big Turtle Wind Farm 2 is a 29 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Big Turtle Wind Farm 2 is reported in Michigan since 2016 under DTE Energy. Available operating and financial measures include 41.5% capacity factor and 107 GWh annual generation; $2009/kW reported CapEx.

Location
Huron, Michigan
Technology
Onshore Wind Turbine
Owner / parent
DTE Energy
Operator
DTE Electric Company
Grid
MISO (Midcontinent)
Plant ID
65143

What stands out

1

Big Turtle Wind Farm 2 is a 29 MW Onshore Wind Turbine asset in Michigan with status Operating.

2

Latest annual operating measures report 41.5% capacity factor and 107 GWh annual generation.

3

Available financial measures include $13391.2/MWh OpEx, $2009/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#32 of 35
National rank
#1044 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.