Query
Big Timber Wind Farm
Type
Entity Briefing
Entity
Big Timber Wind Farm
Technology
wind
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Big Timber Wind Farm

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

25 MW
Capacity
Operating
Current status
2018
Operating since
1
Generators
30.1%
Capacity factor
66 GWh
Annual generation
Briefing/plantOperating

Big Timber Wind Farm is a 25 MW Onshore Wind Turbine asset in Montana, currently Operating.

Big Timber Wind Farm is reported in Montana since 2018 under Consolidated Edison. Available operating and financial measures include 30.1% capacity factor and 66 GWh annual generation; $1453/kW reported CapEx.

Location
Sweet Grass, Montana
Technology
Onshore Wind Turbine
Owner / parent
Consolidated Edison
Operator
RWE Clean Energy
Grid
NorthWestern Energy (NWMT)
Plant ID
61155

What stands out

1

Big Timber Wind Farm is a 25 MW Onshore Wind Turbine asset in Montana with status Operating.

2

Latest annual operating measures report 30.1% capacity factor and 66 GWh annual generation.

3

Available financial measures include $1453/kW CapEx.

Market and operating context

Balancing authority
NorthWestern Energy (NWMT)
NERC region
WECC
State rank
#18 of 25
National rank
#1065 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.