Query
Big Quinnesec 92
Type
Entity Briefing
Entity
Big Quinnesec 92
Generated
2026-10-17T09:00:11.542Z

Briefing on Big Quinnesec 92

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
16 MW
Capacity
Operating
Current status
1949
Operating since
2
Generators
63.4%
Capacity factor
89 GWh
Annual generation
Briefing/plantOperating

Big Quinnesec 92 is a 16 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Operating.

Big Quinnesec 92 is reported in Michigan since 1949 under WEC Energy Group. Available operating and financial measures include 63.4% capacity factor and 89 GWh annual generation; $414/kW reported CapEx.

Location
Dickinson, Michigan
Technology
Conventional Hydroelectric
Owner / parent
WEC Energy Group
Operator
Wisconsin Electric Power Co
Grid
MISO (Midcontinent)
Plant ID
7820

What stands out

1

Big Quinnesec 92 is a 16 MW Conventional Hydroelectric asset in Michigan with status Operating.

2

Latest annual operating measures report 63.4% capacity factor and 89 GWh annual generation.

3

Available financial measures include $10.7/MWh OpEx, $414/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#7 of 51
National rank
#529 of 1,462

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.