Briefing on Big Pine Solar

Entity Briefing
Generated Aug 5, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar
Technology
PJM
Market / region
2031-08-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Big Pine Solar is a 150 MW Solar project in Virginia, currently active.

The reported queue phase is IA Executed. Proposed COD is 2031-08-01.

Queue ID
PJM-AE2-051
Location
Sussex, Virginia
Technology
Solar
Market / region
PJM
Point of interconnection
Carson-Septa 500 kV

What stands out

1

Big Pine Solar is a 150 MW Solar project in Virginia with status active.

2

The reported queue phase is IA Executed; proposed COD is 2031-08-01.

3

Latest linked story: “Richland County boosts green energy” (WLTX, 2025-07-09).

Market and operating context

Queue date
2019-02-01
Proposed COD
2031-08-01
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Big Pine Solar — verified asset snapshot

FieldValue
Queue IDPJM-AE2-051
LocationSussex, Virginia
TechnologySolar
Market / regionPJM
Point of interconnectionCarson-Septa 500 kV
Queue date2019-02-01
Proposed COD2031-08-01
IA statusIA Executed