Big Creek Water Works is a 5 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.
Big Creek Water Works is reported in California since 1987 under Big Creek Water Works Ltd. Available operating and financial measures include 22.2% capacity factor and 10 GWh annual generation; $2294/kW reported CapEx.
- Location
- Trinity, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Big Creek Water Works Ltd
- Operator
- Big Creek Water Works Ltd
- Grid
- CAISO (California)
- Plant ID
- 10282
What stands out
Big Creek Water Works is a 5 MW Conventional Hydroelectric asset in California with status Operating.
Latest annual operating measures report 22.2% capacity factor and 10 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #164 of 247
- National rank
- #867 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.