Query
Big Bend II Solar
Type
Entity Briefing
Entity
Big Bend II Solar
Technology
solar
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Big Bend II Solar

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

46 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
21.5%
Capacity factor
86 GWh
Annual generation
Briefing/plantOperating

Big Bend II Solar is a 46 MW Solar Photovoltaic asset in Florida, currently Operating.

Big Bend II Solar is reported in Florida since 2022 under Emera. Available operating and financial measures include 21.5% capacity factor and 86 GWh annual generation; $981/kW reported CapEx.

Location
Hillsborough, Florida
Technology
Solar Photovoltaic
Owner / parent
Emera
Operator
Tampa Electric Co
Grid
Tampa Electric Company
Plant ID
64641

What stands out

1

Big Bend II Solar is a 46 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 21.5% capacity factor and 86 GWh annual generation.

3

Available financial measures include $5.7/MWh OpEx, $981/kW CapEx.

4

Latest linked story: “Tampa Electric’s Big Bend solar project complete” (Solar Power World, 2017-03-29).

Market and operating context

Balancing authority
Tampa Electric Company
NERC region
SERC
State rank
#191 of 237
National rank
#1493 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.