Query
Big Bend II Solar
Type
Entity Briefing
Entity
Big Bend II Solar
Technology
solar
Generated
2026-10-09T08:35:18.294Z

Briefing on Big Bend II Solar

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
46 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
21.5%
Capacity factor
86 GWh
Annual generation
Briefing/plantOperating

Big Bend II Solar is a 46 MW Solar Photovoltaic asset in Florida, currently Operating.

Big Bend II Solar is reported in Florida since 2022 under Emera. Available operating and financial measures include 21.5% capacity factor and 86 GWh annual generation; $981/kW reported CapEx.

Location
Hillsborough, Florida
Technology
Solar Photovoltaic
Owner / parent
Emera
Operator
Tampa Electric Co
Grid
Tampa Electric Company
Plant ID
64641

What stands out

1

Big Bend II Solar is a 46 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 21.5% capacity factor and 86 GWh annual generation.

3

Available financial measures include $5.7/MWh OpEx, $981/kW CapEx.

4

Latest linked story: “Tampa Electric’s Big Bend solar project complete” (Solar Power World, 2017-03-29).

Market and operating context

Balancing authority
Tampa Electric Company
NERC region
SERC
State rank
#191 of 237
National rank
#1493 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.