Briefing on Big Bend Agrivoltaics

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
11.6%
Capacity factor
1 GWh
Annual generation
Briefing/plantOperating

Big Bend Agrivoltaics is a 1 MW Solar Photovoltaic asset in Florida, currently Operating.

Big Bend Agrivoltaics is reported in Florida since 2022 under Emera. Available operating and financial measures include 11.6% capacity factor and 1 GWh annual generation; $1815/kW reported CapEx.

Location
Hillsborough, Florida
Technology
Solar Photovoltaic
Owner / parent
Emera
Operator
Tampa Electric Co
Grid
Tampa Electric Company
Plant ID
65771

What stands out

1

Big Bend Agrivoltaics is a 1 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 11.6% capacity factor and 1 GWh annual generation.

3

Available financial measures include $21.0/MWh OpEx, $1815/kW CapEx.

4

Latest linked story: “Hurricane Milton slams Florida, leaving 3.4M utility customers without power” (Utility Dive, 2024-10-10).

Market and operating context

Balancing authority
Tampa Electric Company
NERC region
SERC
State rank
#232 of 237
National rank
#7551 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.