Briefing/projectactive
Betel Storage I is a 500 MW Battery project in Texas, currently active.
BETEL STORAGE I is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-08-12.
- Queue ID
- ERCOT-26INR0630
- Location
- Milam, Texas
- Technology
- Battery
- Developer
- BETEL STORAGE I
- Market / region
- ERCOT
- Point of interconnection
- 3377 Little Pond Switch ( LTPSW) 345
What stands out
1
Betel Storage I is a 500 MW Battery project in Texas with status active.
2
BETEL STORAGE I is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-08-12.
Market and operating context
- Queue date
- 2025-01-28
- Proposed COD
- 2026-08-12
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.