Query
Benton Solar II queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Benton Energy Storage II
ISO/RTO
isone
Technology
solar
Generated
2026-10-11T10:46:37.042Z

Briefing on Benton Energy Storage II

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
310 MW
Proposed capacity
active
Current status
Battery
Technology
MISO
Market / region
2028-02-25
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

Benton Energy Storage II is a 310 MW Battery project in Minnesota, currently active.

Xcel Energy is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2028-02-25.

Queue ID
MISO-E0022
Location
Benton, Minnesota
Technology
Battery
Developer
Xcel Energy
Market / region
MISO
Point of interconnection
Benton County 115kV Substation

What stands out

1

Benton Energy Storage II is a 310 MW Battery project in Minnesota with status active.

2

Xcel Energy is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2028-02-25.

Market and operating context

Queue date
2025-08-06
Proposed COD
2028-02-25
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Benton Energy Storage II — verified asset snapshot

FieldValue
Queue IDMISO-E0022
LocationBenton, Minnesota
TechnologyBattery
DeveloperXcel Energy
Market / regionMISO
Point of interconnectionBenton County 115kV Substation
Queue date2025-08-06
Proposed COD2028-02-25