Benton Solar II is a 106 MW Solar project in Minnesota, currently active.
Xcel Energy is the reported developer. The reported queue phase is ERAS Study Cycle 2. Proposed COD is 2028-02-25.
- Queue ID
- MISO-E0020
- Location
- Benton, Minnesota
- Technology
- Solar
- Developer
- Xcel Energy
- Market / region
- MISO
- Point of interconnection
- Benton County 115kV Substation
What stands out
1
Benton Solar II is a 106 MW Solar project in Minnesota with status active.
2
Xcel Energy is the reported developer.
3
The reported queue phase is ERAS Study Cycle 2; proposed COD is 2028-02-25.
Market and operating context
- Queue date
- 2025-08-06
- Proposed COD
- 2028-02-25
- IA status
- In Progress (unknown study)
- Study phase
- ERAS Study Cycle 2
- Service type
- NRIS