Bent Tree Wind Farm Phase 1
Type
Entity Briefing
Entity
Bent Tree Wind Farm Phase 1
State
KY
Technology
wind
Generated
2026-10-12T10:51:39.355Z

Briefing on Bent Tree Wind Farm Phase 1

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
201 MW
Capacity
Operating
Current status
2011
Operating since
1
Generators
19.4%
Capacity factor
343 GWh
Annual generation
Briefing/plantOperating

Bent Tree Wind Farm Phase 1 is a 201 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Bent Tree Wind Farm Phase 1 is reported in Minnesota since 2011 under Alliant Energy. Available operating and financial measures include 19.4% capacity factor and 343 GWh annual generation; $2475/kW reported CapEx.

Location
Freeborn, Minnesota
Technology
Onshore Wind Turbine
Owner / parent
Alliant Energy
Operator
Wisconsin Power & Light Co
Grid
MISO (Midcontinent)
Plant ID
57198

What stands out

1

Bent Tree Wind Farm Phase 1 is a 201 MW Onshore Wind Turbine asset in Minnesota with status Operating.

2

Latest annual operating measures report 19.4% capacity factor and 343 GWh annual generation.

3

Available financial measures include $12.6/MWh OpEx, $2475/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#7 of 123
National rank
#291 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.