Query
BELLEFIELD 3 SOLAR FARM
Type
Entity Briefing
Entity
BELLEFIELD 3 SOLAR FARM
Generated
2026-10-11T00:12:13.808Z

Briefing on BELLEFIELD 3 SOLAR FARM

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
300 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2028-02-27
Proposed COD
C13
Queue phase
Briefing/projectactive

BELLEFIELD 3 SOLAR FARM is a 300 MW Solar+Battery project in California, currently active.

The reported queue phase is C13. Proposed COD is 2028-02-27.

Queue ID
CAISO-1779
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Windhub Substation 230kV

What stands out

1

BELLEFIELD 3 SOLAR FARM is a 300 MW Solar+Battery project in California with status active.

2

The reported queue phase is C13; proposed COD is 2028-02-27.

3

Latest linked story: “AES purchases 2GW Bellefield solar-plus-storage project in California” (PV Tech, 2023-06-07).

Market and operating context

Queue date
2020-04-15
Proposed COD
2028-02-27
IA status
IA Executed
Study phase
C13
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

BELLEFIELD 3 SOLAR FARM — verified asset snapshot

FieldValue
Queue IDCAISO-1779
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionWindhub Substation 230kV
Queue date2020-04-15
Proposed COD2028-02-27
IA statusIA Executed