Query
Bell Song Solar 3
Type
Entity Briefing
Entity
Bell Song Solar 3
Generated
2026-10-20T04:35:17.410Z

Briefing on Bell Song Solar 3

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
168 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2030-08-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bell Song Solar 3 is a 168 MW Solar project in Texas, currently active.

Bell Song Solar, LLC_3 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-08-31.

Queue ID
ERCOT-31INR0009
Location
Jim Hogg, Texas
Technology
Solar
Developer
Bell Song Solar, LLC_3
Market / region
ERCOT
Point of interconnection
Tap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1

What stands out

1

Bell Song Solar 3 is a 168 MW Solar project in Texas with status active.

2

Bell Song Solar, LLC_3 is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-08-31.

Market and operating context

Queue date
2025-06-19
Proposed COD
2030-08-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bell Song Solar 3 — verified asset snapshot

FieldValue
Queue IDERCOT-31INR0009
LocationJim Hogg, Texas
TechnologySolar
DeveloperBell Song Solar, LLC_3
Market / regionERCOT
Point of interconnectionTap 345 kV #80079 CRUCE7A - #80355 DELSOL7A ckt 1
Queue date2025-06-19
Proposed COD2030-08-31