Briefing/projectactive
Bell Song Solar 2 is a 168 MW Solar project in Texas, currently active.
Bell Song Solar, LLC 2 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-03-16.
- Queue ID
- ERCOT-30INR0049
- Location
- Jim Hogg, Texas
- Technology
- Solar
- Developer
- Bell Song Solar, LLC 2
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV (#80079) CRUCE7A - (#80355) DELSOL7A ckt 1
What stands out
1
Bell Song Solar 2 is a 168 MW Solar project in Texas with status active.
2
Bell Song Solar, LLC 2 is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2030-03-16.
Market and operating context
- Queue date
- 2025-06-12
- Proposed COD
- 2030-03-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.