Bell Creek BESS is a 201 MW Battery project in Texas, currently active.
BELL CREEK BESS, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-10-30.
- Queue ID
- ERCOT-25INR0480
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- BELL CREEK BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 39500 West Colombia - 39703 FM524
What stands out
Bell Creek BESS is a 201 MW Battery project in Texas with status active.
BELL CREEK BESS, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-10-30.
Latest linked story: “DESRI backs Linea Energy’s 235-MW Texas battery with preferred equity” (Renewables Now, 2026-03-09).
Market and operating context
- Queue date
- 2023-06-28
- Proposed COD
- 2027-10-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.