Becerra Creek Storage 2 is a 126 MW Battery project in Texas, currently active.
Bordas Renewable Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-27INR0003
- Location
- Webb, Texas
- Technology
- Battery
- Developer
- Bordas Renewable Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Cenizo Substation (#80220)
What stands out
1
Becerra Creek Storage 2 is a 126 MW Battery project in Texas with status active.
2
Bordas Renewable Energy, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2022-09-21
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study