Query
Barton Chapel Wind Farm
Type
Entity Briefing
Entity
Barton Chapel Wind Farm
Technology
wind
Generated
2026-10-17T10:20:30.712Z

Briefing on Barton Chapel Wind Farm

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
120 MW
Capacity
Operating
Current status
2009
Operating since
1
Generators
20.0%
Capacity factor
211 GWh
Annual generation
Briefing/plantOperating

Barton Chapel Wind Farm is a 120 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Barton Chapel Wind Farm is reported in Texas since 2009 under Avangrid. Available operating and financial measures include 20.0% capacity factor and 211 GWh annual generation; $1895/kW reported CapEx.

Location
Jack, Texas
Technology
Onshore Wind Turbine
Owner / parent
Avangrid
Operator
Avangrid Power LLC
Grid
ERCOT (Texas)
Plant ID
57156

What stands out

1

Barton Chapel Wind Farm is a 120 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 20.0% capacity factor and 211 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#198 of 252
National rank
#630 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.