Briefing on Barrosos Creek Wind 3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
198 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Barrosos Creek Wind 3 is a 198 MW Wind project in Texas, currently active.

Cascabel Wind Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-31.

Queue ID
ERCOT-28INR0337
Location
Zapata, Texas
Technology
Wind
Developer
Cascabel Wind Energy, LLC
Market / region
ERCOT
Point of interconnection
#80227 Rapido 345 kV

What stands out

1

Barrosos Creek Wind 3 is a 198 MW Wind project in Texas with status active.

2

Cascabel Wind Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-31.

Market and operating context

Queue date
2025-08-18
Proposed COD
2028-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Barrosos Creek Wind 3 — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0337
LocationZapata, Texas
TechnologyWind
DeveloperCascabel Wind Energy, LLC
Market / regionERCOT
Point of interconnection#80227 Rapido 345 kV
Queue date2025-08-18
Proposed COD2028-05-31