Barranca Wind 2 is a 299 MW Wind project in Texas, currently active.
Barranca Wind Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.
- Queue ID
- ERCOT-28INR0376
- Location
- Jim Hogg, Texas
- Technology
- Wind
- Developer
- Barranca Wind Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap the 345 kV CENIZO7C (#80225) - DELSOL7C (#80307) line.
What stands out
1
Barranca Wind 2 is a 299 MW Wind project in Texas with status active.
2
Barranca Wind Energy, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-06-01.
Market and operating context
- Queue date
- 2025-07-29
- Proposed COD
- 2028-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.