Briefing on Barbara BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-05-02
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Barbara BESS is a 201 MW Battery project in Texas, currently active.

Barbara BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-02.

Queue ID
ERCOT-28INR0437
Location
Nueces, Texas
Technology
Battery
Developer
Barbara BESS LLC
Market / region
ERCOT
Point of interconnection
LINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE

What stands out

1

Barbara BESS is a 201 MW Battery project in Texas with status active.

2

Barbara BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-02.

Market and operating context

Queue date
2025-09-22
Proposed COD
2028-05-02
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Barbara BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0437
LocationNueces, Texas
TechnologyBattery
DeveloperBarbara BESS LLC
Market / regionERCOT
Point of interconnectionLINE TAP OF WESTSIDE (8485) AND WEIL TRACT (8482) 138 KV TRANSMISSION LINE
Queue date2025-09-22
Proposed COD2028-05-02