Query
Baker Branch BESS
Type
Entity Briefing
Entity
Baker Branch BESS
State
TN
Technology
battery
Generated
2026-10-12T04:09:24.771Z

Briefing on Baker Branch BESS

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
287 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Baker Branch BESS is a 287 MW Battery project in Texas, currently active.

Mockingbird Storage Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-31.

Queue ID
ERCOT-27INR0409
Location
Lamar, Texas
Technology
Battery
Developer
Mockingbird Storage Center, LLC
Market / region
ERCOT
Point of interconnection
Pacific Switch (PACSW) 345 kV Bus 11683

What stands out

1

Baker Branch BESS is a 287 MW Battery project in Texas with status active.

2

Mockingbird Storage Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-31.

Market and operating context

Queue date
2025-06-19
Proposed COD
2029-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Baker Branch BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0409
LocationLamar, Texas
TechnologyBattery
DeveloperMockingbird Storage Center, LLC
Market / regionERCOT
Point of interconnectionPacific Switch (PACSW) 345 kV Bus 11683
Queue date2025-06-19
Proposed COD2029-12-31